+91 7249 418 365 info@civilengineers.co.in

ADVANCED SURVEYING WITH TOTAL STATION

ADVANCED SURVEYING WITH TOTAL STATION

Course Contents:

  1. Introduction
  2. Advantages and Disadvantages of Total Station.
  3. Accessories for total station.
  4. Measuring Angles with Total station.
  5. Type of Total Stations.
  6. Measurement Principle of EDM Instrument.
  7. EDM Instrument Characteristics.
  8. Error Correction in Electronic Distance Measurements.
  9. Prisms Used for Electronic Distance Measurements.
  10. Geometry of Electronic DIstance Measurements.
  11. Focussing and Sighting.
  12. Surveying Using Field Equipment.
  13. Setting up a Back Sight.
  14. Measurement with Total Station.
  15. Total Station Initial Setting (General setting Required for all Models)
  16. Field Book Recording. 
  17. Redial Shooting.
  18. Occupied Point (Instrument station  ) Entries.
  19. Open and close traversing using total station.
  20. Error Sources of Electronic Therodolite.
  21. Trigonometric Levellingg and Vertical Traversing .
  22. Trigonometric Leavelling-Field Procedures.
  23. Trigonometric Levelling-Error Sources.
  24. Data Collection Operating Procedures.
  25. Responsibility of thee Field Crew for Data Collection and Processing.
  26. Interfacing the Data Collector with a Computer.
  27. Digital transfer of the Data to Application Software.
  28. Requirements of a Data Collector.
  29. Coding of Field Data While Using a Data Collector.
  30. Summary of Data Collector Field-to-Finish Procedures .
  31. Surveying Procedure when the instrument is setup first time.
  32. Shifting the station by aligning to the back point.
  33. Stake out using total station .
  34. Steps for operating free station program.
  35. Steps for operating the Reference Line.
  36. Steps for operating the Tie Distance Program.
  37. Steps for operating the Area Program.
  38. Remote height Program.
  39. Memory initialization or job deletion.
  40. Steps For Downloading the Data From TS.

Contact Us